IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE
METHOD IS BEST?
I THINK WORKING STRESS METHOD IS BEST?
EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST
IS;1913SQ.MM
SAME TIME WORKING STRESS METHOD IS ;2213.
SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE
THEN LIMIT STATE METHOD?
MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
Answer Posted / santosh singh
dear
what is u r qualification if ur a civil engineer this is a
stupid question.
see there is difference in working stress method and limit
state method
eg. if we design any member of building in case of working
stress method ie eg FOR 1000KN THERE IS DESIGN FOR ONLY
THIS LOAD
BUT in case of limit state method a factor of safety 1.5 is
used ie same member in limit state will be designed FOR
1.5 X 1000 = 1500KN
THUS THERE IS SAFETY IN DESIGN UR MEMBER CAN WITHSTAND LOAD
OF 1000KN BUT WE DESIGN IT TO WITHSTAND A LOAD 1500KN IE U
R STRUCTURE WILL NOT FAIL.
IF U DESIGN STRUCTURE FOR 1000KN LOAD AND ITS LOAD
CARRYING CAPACITY IS 1000KN THEN U R STRUCTURE WILL
COLLAPSE
THUS LIMITE STATE METHEOD IF BEST TODAY
IN 1900 WORKING STREE METHOD CAME
AFTER THAT ULTIMATE LOAD METHOD CAME
& THEN CAME LIMIT STATE METHOD
| Is This Answer Correct ? | 26 Yes | 1 No |
Post New Answer View All Answers
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
How to calculate 1 brss for RCC work
may i know the detailed description of cutting length
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
Define a polyline?
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
How to find out slope footing concrete
What is the difference between Fe 500, Fe 500 D and Fe 515.
how to calculate weight of 1.8 cum of aggregate
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is mc arther pile?
What are the RISKS during the project construction?
how to find hardness of water?why it should be determined?
satart to end steps by step process of building construction...? i want to planning theme accuretly
what are the challenges of being a team leader and a supervisor?