Hi,
I have run the standard cost estimate for one product. Can
any one tell me the planning steps for 100 products.
Sravan
Answer Posted / uday kumar y
CK11n is used for standard cost estimation.
to run that we have to run ck24 also.
Use CK40N f0r 100 products
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Explain what happens to plan after it has been converted into production order?
What is a ‘work center’ in pp?
What is processing class, where we do them and why?
What is purpose of schedule margin key?
In lsmw which is the most important step?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Difference between Routing, Ref op set, Rate routing and Ref rate routing.
What is Material status and which view of the material master it is available?
Explain how ‘pp’ is ‘integrated’ with other modules?
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
In implementation stage tell some standard scenario before AS-Is & TO-BE
Explain the gaps and the steps involved in them.
a company needs 12 standard values. how it can be maintained?
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
Explain Planning file entry.