How do you derive the quantity of cement & sand in brick work
construction in 1Meter cube, using CM 1:6 and bricks of size
19*9*9 cm

Answer Posted / mandeep thakur

By this Formula we can Work out roughly, But Not 100%
Correct
0.3*28.8/sum of Ratio e.g(1:4 is equal 1+4=5
than .3*28.8/5 Only For brick Work.

Is This Answer Correct ?    9 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

whats is difference between anchorage length and development length

1374


In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.

3711


Tell me about triple point of water.

672


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

1640


could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!

1659






In jack arch floor, the rise is kept?

710


what is the relation between pitch of steel and depth of slab?

2902


How do we calculate absolute pressure?

769


How to calculate construction cost of residential building in mumbai

1470


How do you maintain water pressure?

652


What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?

1392


how to calculate the weight of concrete

1024


why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

10205


1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?

2026


I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,

1511