How do you derive the quantity of cement & sand in brick work
construction in 1Meter cube, using CM 1:6 and bricks of size
19*9*9 cm
Answer Posted / mandeep thakur
By this Formula we can Work out roughly, But Not 100%
Correct
0.3*28.8/sum of Ratio e.g(1:4 is equal 1+4=5
than .3*28.8/5 Only For brick Work.
| Is This Answer Correct ? | 9 Yes | 5 No |
Post New Answer View All Answers
What is the development length given in pile?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
What is aggregate?
What are advancements in civil engineering?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
Define What materials were used to build the Golden Gate Bridge?
why building got air crack? if it get in one particular are what is means?
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
how to stop beam concrete between column
For Wet Mix Mecadam design what is Optimum moisture content
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
How to increase a bearing capacity of soil?