Answer Posted / loboreliance2003
P&ID is Process and Instrumentation Diagram. This is most
important for any process especially related to chemical,
petrochemical plants. It is also known as Piping and
Instrumentation Diagram since in this is mentioned the
various pipelines, valves, instruments location and also
electrical especially control room related.
Is This Answer Correct ? | 56 Yes | 9 No |
Post New Answer View All Answers
There are many type of control cable like pair,core,tried, What are defination each one
What is the calibration procedure of Drum level transmitter if range is 0 to -400 mmh2o in lab?
any body who gone thru recent iocl interview.INSTRUMENTATION questions. I need.
To become an Instrument DESIGN engineer, is there any softwares or training to become Instrument Design engineer, plz suggest me, Iam very much interested in designing.
how many types of spped sensors n vibration sensors?their basic principle n connection?
Why MUX JB's are using only Temperature Element in Fundation field bus?
What is wet leg condition and why is it used?
What is limitation of the ht.of the displacer of a level trol?
What is shielding effect?
There are two chlorination tonners both are connected to two pressure swithes and the pressure switch is connected to SOV which operates the valve to changeover the tonner selection i.e if pressure one tonner goes low the other tonner should come in line if it is inautomatic selection design a circuit using relays ?
We Have Two Field bus Pressure Transmitters of Different Sensor Range (I.E One is of Lower range and Another is of Higher Range).Is same Process Line. My Question is Can i provide Saturation Limit to my field Bus Transmitter as We can provide Saturation current limit to HART Instruments. As During Low Pressure Both Working OK ,But During High Pressure, transmitter with Lower sensor range Goes to Fault mode as Beyond its Sensor Limit it can Measure, So may I provide Saturation point Some where to Suppress This Fault during High Pressure.
Explain why plc require in analog input 4-20amp & 0-10 volt?
why we are not using the turbine flow meter in the steam service?
why use 50% lel methane gas concentration for gas detector calibration instead of 60% lel gas concentration whereas the hi alarm set at 60% lel.
HOW TO CALCULATE ACCURACY OF AN INSTRUMENT. WHICH IS COMPITABLE FOR USE.