table a contains 5 columns and table b contains 5 columns
how can i get 10 columns at target?
Answer Posted / arshad basha
hi... if the meta data are same in both tables we can go for funnel stage.If atleast one column is same in both tables we can go for merge and join stage and ofcourse can use look up.
| Is This Answer Correct ? | 2 Yes | 8 No |
Post New Answer View All Answers
What are the features of datastage flow designer?
How do you import and export data into datastage?
Explain usage analysis in datastage?
whom do you report?
What is job control?
What is the differentiate between data file and descriptor file?
What are the differences between datastage and informatica?
what is the use of materialized view?
What is the use of datastage designer?
What are the main features of datastage?
How can we improve performance of data stage jobs?
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
What is the project in datastage?
why do u need the IOS upgradation in a FC switch
What is the flow of loading data into fact & dimensional tables?