Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How many number of bricks required for 1 cum & how much mortar
quantity require for 1 cum

Answer Posted / bhavya

can u tell me how this practical and theoritical value is different???

Is This Answer Correct ?    19 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to determine spacing of bars in slabs or beams

2516


Define What is the origin of name Railway Sleepers?

1332


I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

2128


cause of cylinder test failure

3353


what pressure the NP2 class RCC pipe can sustain?

2753


Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings

2195


how calucate cement sand ratio for plstering

2030


What is the quantity of cement in mix m20 concrete?

1230


What is Curtailing of R/F

2527


Why the finite element method is lower bound solution?

3051


Under what circumstances should pot bearings be used instead of elastomeric bearings?

1187


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

2032


what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)

1864


How and where are aqueducts built?

1252


How to calculate plastering for elevated water storage tank

1332