How to calculate the amount of cement & sand required for
plastering work with ratio 1:4 please give me an answer with
detailed step.

Answer Posted / rajarshi basu

Area to be plastered=100 m^2
Thickness of plaster=12mm=(12/1000)m= 0.012m
Volume of mortar required= 100 x 0.012= 1.20 m^3
Add 20% extra mortar for filling joint,depressions and
wastage.

Volume of the mortar= [0.20 X 1.20]+ 1.20=1.44 m^3
[Wet Volume]

Increase further by One-third of the volume to get Dry
volume
Quantity becomes= [(1/3) X 1.44]+ 1.44=1.92 m^3

Summation of proportion=1+4=5
For 12mm plastering in 1:4 cement :sand mortar mix:

1)Cement required= 1.92/5= 0.384 cu. m
No. of bags of cement= 0.384/0.0347=11.06 bags

>> 11 bags(say)
Cement used =11 x 50= 550 kg

2)Sand required= [1.92 x (4/5)]= 1.536 cu. m

Important note:
[Weight of 1 bag of cement= 50 kg
Cement should be always measured by weight to avoid
variation.

One 50 kg bag of cement weighs 1440 kg/cu. m
Volume of 1 bag of cement= 50/1440=0.0347 cu. m ]

Therefore to convert Cu. m into No of bags of 50 kg
cement,just divide the volume of cement by 0.0347

Hope u have understood!!!!

Is This Answer Correct ?    482 Yes 42 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to stop beam concrete between column

1900


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1272


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2232


how we check the thickness and line of ceiling plaster.

2221


Which prize is the alternative to the NOVEL Prize?

1872






What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?

2105


"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.

1619


what are the five benefits of using standard terminology in the measurement process?

1663


Mention different types of roof systems?

723


Basic civil interview questions 

1855


strength vs shape factor

2127


What is aggregate?

723


about higyway engineering

3551


Is there any course for billing available in Mumbai? If yes then please mail me the details..

1807


how to clculate the %of concrete strenght achive after curing?load

1929