how can u handle null values in transformer stage.
Answer Posted / prabhath.p
by using 1).Null to value(input column)
2.null to empty(input column)
3.if is null(input column_then
three commands are there in transformers for null handling
Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
What is orabulk stage?
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
how can we validate the flat files using the date in the header and number of records in the flat file? Using both conditions at a time.
Define data aggregation?
What is the flow of loading data into fact & dimensional tables?
Name the command line functions to import and export the DS jobs?
What are the functionalities of link partitioner?
What is the difference between account and directory options ?
Can you explain link buffering?
explain about completely flow of sequencers technicaly,without using example??explain about lookup,nullhandling?
Explain the importance of surrogate key in data warehousing?
disign the complex job in u r project?(they are aksing only complex job design and then data flow...)
How to reverse the string using unix?
hi.... am facing typical problem in every interview " I need some critical scenarios faced in real time" plz help me guys
In work load management there are three options of Low priority, Medium priority and High Priority Jobs which can be used for resource management. why this feature is developed when there is already jobs prescheduled by scheduler or autosys. what will be the use of workload management then?