Answer Posted / syed nasir ali
I DO HAVE PLCs IN MY ORGANIZATION THEY ARE SIEMENS SIMATIC
S7 400, SIEMENS SIMATIC S7 300 , SIEMENS SIMATIC
S5,MITSUBISHI , ALLEN BRADELY
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
DG SET BLOCK DIGRAM
How should i design a 1ph & 3 ph transformer. Kindly let meknow all steps and formulaes related to design from scratch.
some basic standard questions on transformer.
Load transfer in 11kv double busbar switchgear - operation.
Where can I get CPWD electrical specifications & Shedule of rates? Please help me
sir i applied for hpcl(electrical).i want to know from which subjects most of the technical que will b asked.and pattern of the written test.pls help me
Why the power generated in dams is complex power? Why the generators in dams cannot produce Real power directly (i.e power which has zero reactive part)?
Single line digram for 11 kV to distribution use go,la and do
concept of busbar and load dispatching..?
what is the difference between online & offline caliberation of KWH meters. Can Digital meters be caliberated
If I want to buy a new Xformer for my plant what are the main parameter will I need to check?
how to do the ductor test?
why the difference arise between HT reading & LT reading (submeters fixed in complexes, apartments etc)if the power factos exceed from 0.9 to 1 can the ht meter reads fast?
Differnce between negative Pahse SequenceFunction and unbalance Function?
what is the requirement regarding earthing of Single conductor with AWA