in the area of circle O is (22/7)k what is the value of k
Answer Posted / vishal pitaliya
area of circle=(22/7)*r^2
so value of k=r^2
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
After spending 2/3 of his salary on rent and food items and 1/4th of the remaining on transportation, Rajesh has 6000 with him. How much did he pay on transportation?
A shopkeeper bought a watch for Rs.400 and sold it for Rs.500.What is his profit percentage?
All birds are animals. All animals are four legged. Implications a. All animals which are four legged are birds. b. All birds are four legged c. Some birds are four legged d. Some birds are animals but not four legged.
A speaks truth 70% of the times, B speaks truth 80% of the times.What is the probability that both are contradicting each other is ?
hello..i hav cleared SBI written exm..i am a post graduate in english..wht type of questions they may ask me at the interview? plz help.
quants,logical,verbal
If we r terminated at the middle of the program execution in UNIX,wat will happen to the program,it will continue running r terminate r the o/p will be send to ur mail?
low temperature at the night in a city is 1/3 more than ½ hinge as higher temperature in a day. sum of the low temp and higherst temp is 100C. then what is the low temperature
A man collects cigarette stubs and makes one full cigarette with every 8 stubs.If he gets 64 stubs how many full cigarettes can he smoke.
What do you think are your personal strengths and what are the areas where you need to improve as an individual?
A batsman scores 23 runs and increases his average from 15 to 16. Find the runs to be made if he wants top Inc the average to 18 in the same match.
If the bus travels with 8 tyres(6 tyres running),travels a distance of 16000 km how much is the distance sustained by each tyre.
ABCE is an isosceles trapezoid and ACDE is a rectangle. AB = 10 and EC = 20. What is the length of AE?
guttural : throat :: gastric :
A finishes the work in 10 days & B in 8 days individually. If A works for only 6 days then how many days should B work to complete A's work?