If there are some errors in goods movements, and less stock
of material consumed, how can i solve that problem in SAP.
Answer Posted / varun jalota
According to me COGI is basically a SAP standardised system
which will tell you that what is the error in some cases it
can rectify it too.
But if the entry is done manually by MB1A, MB1B, MB1C you
have to bring back or cancell the movement or move the
stock to desired material and then refresh COGI.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
• How are basic order dates determined?
What is the use of stock requirement list?
Can't one material be assigned to more than one operation in a routing?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
Explain the planning steps for 100 products?
How requirements( pir,sles order, customer requirement) are reduced after they are produced?
What is plm (product lifecycle management) in sap pp and what is the use?
We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?
Explain schedule margin key
Integration between PP and PM module.
what are the settings needed for variant configuration?
How to create opbject dependencies in a bom for a configurable material?
In cost controlling information system mention the fields that are listed in the list screen of the report?
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
What is Planning time Fence?