Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

which one is economical construction brick masonry or sold
block masonry?

Answer Posted / us rao

both work out to be the same.because mostly clay bricks are
highly irregular in shape when compared to solid blocks.it
is always adviseble to use solid blocks which have least
moisture absorptionand minimun plastering thickness.

Is This Answer Correct ?    8 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

1638


what is the minimum cement content for M20 & M25 as per is code -456(2000).

3250


How do you maintain water pressure?

1239


though u r a civil engineer, y r u interested in tcs???

2636


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1811


How to design staircase.plz tell me formula for the design the staircase.

2040


Explain what is the release of lien?

1295


strength vs shape factor

2600


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1536


how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

2905


What are new methods /technologies of pothole patching?

2460


Form where IS456 is adopted in 1978?

2043


five requirements of infill panels for walls?

3781


How many cum of 9.5mm stone in 1 ton ?

2589


can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?

2613