In transformers Which type of connection is preferred for
harmonics to be minimum.
primary : secondary
star without neutral:open delta
star with neutral :open delta
star without neutral: delta
star with neutral : delta
explain why
Answer Posted / sudheer868
ANS is star with neutral and delta.For harmonics effect to
be minimum we must provide a closed path for harmonics in
phases so that they circulate only in phases and does not
enter into line.Hence harmonic effect is less in delta
connection than in star connection.In star star connection
ti provide closed for harmonics neutral is grounded
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
why do we measure VIBRATION in -24vdc and why we adjust gap voltage -9vdc to 10-vdc? i am trying to get this information since 5 years, yet i haven't get reliable answer, i hope i can get from you.
testing of Vector Group – YNaoD II
I want to ask that is there any relation between current denesity of copper and material purity. also is ther any standard which defines the standard current denesity of material.
write a c++ code that receives an integer number and display the sum of the number and its revers integer?
How servo stabilizer works.
How is the connection of the tap changer on the HV side been made?
what's prime importance of protection in electrical system.if protection system don't work properly what can happen in electrical system?
Whats the minimum value for I.R. that can be allowed for HT & LT alternators for operation?
In constant power region of 3-phase IM torque-speed characteristics, if frequency increases flux A does not alter B decreases C increases D none of above
What is the HVDC Transmission System? What are the conditions applicable to lay an HVDC Line?
How can i calculate the Breaking capacity of molded case circuit breaker, is the breaking capacity of CB for Diesel generator shall be less than grid supply's breaker ?
May I know how much values to be set for earth fault, over current and short circuit values at 11kv side? I have 11kv van 1250amps rating. Present it's taking load 80amps?
why ahould you show client/engineer activities clearly on the project plan
Explain how you intend to work under pressure to meet up with deadline target?
what is a composite error in current transformers, why occurs & in which it will occur i.e, either metering ct/ protection ct