Answer Posted / ajith294
The above answer is correct. we have to need the dead zero,
so we are using 4 to 20 mA instead of 1 to 16 ma
| Is This Answer Correct ? | 12 Yes | 8 No |
Post New Answer View All Answers
I m appointed as an automation trainee engineer in small firm in that I am only the one , my company give me a project on s7-200 as i m beginner I don't know how to program so please send me the helpful site so that I complete my project before deadline....please help me out in this critical situation.
How r the calculation of process line mpm.
what is orfics working in main steam line. is it increase pressure, velocity of steam flow and dicrease steam flow rate. or any other
Why do you want to work here
how do calibrate the valves.. with clear manual
sir, i preparing hpcl,ongc,barc,hal exams(instrumentation engg)pls send a placement papers
what is the responsibility of an instrument commissioning supervisor
What is feed factor and its Importance in cement industry? How we can solve feed factor?.
what is the difference between -24 : +24 & 0:24 and where it use?
how u choose thermowell lenght n pnumatic C/v size?
how is work pressure switch& level switch?what is the principle of this?
What is the advantage of using locally fabricated hook ups over Pre fabricated hook ups in process instrumentation?
how do we commission inergen system?
what is zero and span ?
what is 24vdc live and dry supply