Answer Posted / vicky
it depends on size of block/brick
for 1 cum. of blockwork (1:6) (block size - 300X160X190mm)
you can use thumb rule i.e. 70% bricks & 30% mortar
means u have to take 30% of 1 cum. & adding 15% for wet
mortar means total 0.45 cum. mortar required, then u can
calculate the cement = 0.45/(1+6) = 0.064 cum.= 1.83 bags.
same as for brickwork
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
How do you calculate the power of a centrifugal pump?
What are the alternate material for steel, Sand and aggregate
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
How are freeway bridges built?
Spider cracks occur in beam bottom due to––
if the nitrates more than 45mg/l in water lead to disease then what is it called
What is hybrid foundation?
what is the calculation of raw material for 0.35cum of m-15
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
What is the primary difference between adsorption and absorption?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
procedure for preliminary selection of size of column of 5 storey building
how many shuttering material required for 1000 sq.m built up area.