Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Cement Co-eff. in block 1:6, brick1:4 work?

Answer Posted / vicky

it depends on size of block/brick
for 1 cum. of blockwork (1:6) (block size - 300X160X190mm)
you can use thumb rule i.e. 70% bricks & 30% mortar
means u have to take 30% of 1 cum. & adding 15% for wet
mortar means total 0.45 cum. mortar required, then u can
calculate the cement = 0.45/(1+6) = 0.064 cum.= 1.83 bags.

same as for brickwork

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width

1629


how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.

2699


Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?

1736


What is meant by solid geometry?

1117


what are the layers of the national and heir aprox thickness??

2189


how many cement used in single story residential building per sqft

1790


please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)

1787


"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.

2108


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2321


Why are separation membranes used between concrete pavement slab and sub-base?

1428


quantity of material needed for rubble stone masonry for 1:4 and 1:6

1887


how to calculate MR 9(derivation)

3033


Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai

3126


Define the various stages of the project planning process in construction.

1130


how to workable concrete cube test M-25 design mix

3529