How to calculate the cement, sand quantity for plastering?
(10'x10')10mm thick ratio 1:5. wht"s the formula?
Answer Posted / aijaz hussain, modi builders
as per the thumb rule,
quantity of cement required= 0.645 bag= 32.25 kg.= 0.77 cft.
quantity of sand required = 0.77 x 5 = 3.84 cft.
Is This Answer Correct ? | 24 Yes | 27 No |
Post New Answer View All Answers
What is the likely strength of a 1:2:4 concrete mix?
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
what are the proper pipes for salt water line
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
List out the types of roofs?
What is different between DI Pipe and CI pipe?
Please let me know what is the simplest way of Calculating Mix Designs
what is meant by residual strain?
What are the uses of groynes?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
Explain the design for rcc multi-storied building?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.