how to calculate the mf of kwh meter,if ct the ratio on
meter is 100/5A
Answer Posted / veerendra
or u can just do one thing...
see the range for the wattmeter..
& use the formula below..
((voltage range)* (current range))/ (full scale deflection
fro the meter)
| Is This Answer Correct ? | 27 Yes | 12 No |
Post New Answer View All Answers
Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT
What kind of preventive maintenance are there for transformer?
132/6.6ππ πππππππππππ πππππππ πππ πππ πππππ πππ πππππππππ. πΈ'ππ πππππππ πππππππππππ ππ 6.6ππ/415π πππ πΈ πππππππ πππππππ ππ ππππ πππππ πππ ππ ππ 13/6.ππ πππππππππππ?? πΈπ π½π.. ππππ π ππ’??
How to calculate capacitor bank size at a load 800kVA.
Mention the difference between Analogue and Digital circuit?
is oil viscosity affect on motor current?
what is the max. acceptable leakage current in 33kv bus bar
why electronic instruments is more favorable than electrical?
7- What is the Dissipation Factor and the difference between it and Insulation Resistance Test? 8- What is the task (function) of DC and AC reactors in power plant? 9- What is the task (function) of (open delta with earthed) in some types in transformers? 10- What is the base of the selection of the vector group in transformers? 11- What is the zig-zag transformer and its function by drawing in large detail? 12- What is the polarity ? 13- Why we make short between phase(R) in high side and phase (r) in low side in vector group test? Where High Side ( R ,S and T ) and Low Side ( r ,s and t ). 14- What are the time on delay and time off delay? 15- What is the vector group? 15- What is the task (function) of different types of vector group such as Dyn11 , Dd0 , YNd1,β¦β¦..,?
pls tell us AC plant are how do work and parts name with picture
explain the function of brush less dc motor?
Difference between control junction box (cjb) and power junction box(pjb)?
why and where we use early make & late break contacts in protection?
what is the string efficiency
How to calculate earth fault current for 6.6 KV , 50 HZ , 756 Amps , 3000 RPM , 0.8 PF generator