what are the costing parameter ?
Answer Posted / balarama boddeti
Hi,
The costing Parameters are the following
Work center : Activity types and the formulaes,cost center
Routing : the time ,activity types
In Production order dependent parameters we are defining
the Variant ,result analysis key,settlement profile
In the controlling i.e in KP 26 we will be defining the
rates per hour depending on the rates it will reflect the
cost caluculating from the routing..
Balaram
| Is This Answer Correct ? | 22 Yes | 2 No |
Post New Answer View All Answers
What is detail scheduling
We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
What is the output of mps run ?
Explain what is prt (production resource tools) in sap pp?
What is planned consumption and unplanned consumption?
Difference between base unit of measure, production unit, order unit
How to create opbject dependencies in a bom for a configurable material?
Can't one material be assigned to more than one operation in a routing?
Define 'sop' (sales & operations planning)?
Integration between PP and QM Module.
What do we do in the realization phase?
Tell one biggest task for you
I have having 14 years manufacturing experence & 6 years in SAP-PP/QM.Was a core member during implementation.Now I want to work as Functional Consultant in SAP-PP/QM.What should I do for getting the jobs.
What is the difference between indian and us payroll?
How can you get planned orders scheduled so that you can do capacity leveling ?