Describe the change process for material BOMs. Include
release procedure/status, notifications, responsibilities,
authorizations, involved systems, engineering change
management,revision levels, synchronization with current
production orders, other.
Answer Posted / bishnu
the following procedure by the change management
1.use the transaction code CC01 for making a change
management no
2.now remember the change no
3.then,change the bom by transaction code CS02
4.enter the change no & edit the bom as per requirement
5.save
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
How to create prt master records?
Explain how ‘pp’ is ‘integrated’ with other modules?
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
What is end user training
Are there any reports in sap to list of material requirement from ltp ?
Mention what are the keyfields found in mrp view 1?
How are time management and payroll are integrated?
What happens to planned after it has been converted into production order ?
How to create opbject dependencies in a bom for a configurable material?
What is standard order type
What is "work center" in sap pp and what is the use of data in work centers?
define variable cost
Explain what is the need of mrp list if the stock requirement list is already given?
What is the t-code for changing production order and to display production order?
What is process keys