A software engineer has the capability of thinking 100
lines of code in five
minutes and can type 100 lines of code in 10 minutes. He
takes a break for
five minutes after every ten minutes. How many lines of
codes will he
complete typing after an hour?
Answer Posted / saurabh chhabra
250
| Is This Answer Correct ? | 27 Yes | 1 No |
Post New Answer View All Answers
Find the value of @@+25-++@1..., where @ denotes "square" and + denotes "square root".
A person gives a secret to two other persons in 5 minutes. How long will he take to tell the secret to 768 people?
If a ball falls from 16 feet takes 4 seconds. How much time it will take when falls from 64 feets.
A hotel has 10 storeys. Which floor is above the floor below the floor, below the floor above the floor, below the floor above the fifth.
A dealer sells 3 sets at Rs.2400 each ,one at 20% gain and the other at 20% loss. what is the overall gain or loss.
The price of raw materials has gone up by 15%, labour cost has also increased from 25% of the cost of raw material to 30% of the cost of raw material. By how much percentage should there be a reduction in the usage of raw materials so as to keep the cost same
A wizard named Nepo says "I am only three times my son's age. My father is 40 years more than twice my age. Together the three of us are a mere 1240 years old." How old is Nepo?
what can you contribute to the fiscal commission?
12 Blacksox and 12 Whitesox mixed in a box,a pair of sox is picked at a time,in which pick how many pick ,to get the right pair(black&black or white&white)?
How many different 9 digit numbers can be formed from the number 223355888 by re-arranging its digits so that the odd digits occupy even position?
Imagine 4 persons A,B,C,D.(It is a strength determining game). A found it hard,but could pull 'c' and 'd' to his side. AC and BD pairs on opposite sides found themselves equally balanced. When A and B exchanged their positions to form pairs AD and BC ,BC pair could win and pull AD to their side.Order the 4 persons in Ascending order according to their strengths.
During a given week A programmer spends 1/4 of his time preparing flow chart, 3/8 of his time coding and the rest of the time in debugging the programs. If he works 48 hours during the week , how many hours did he spend debugging the program.
if 2x-y=4 then 6x-y is
X and Y are partners in a business. X invests 300 for 12 months and Y invested 600 for 6 months. If they gain a profit of 700 at the end of one year, what is X's share?
Dear Sir/ Madam, Kindly send me the model question answers for RRB-Technician Signal(Physics/Maths) to saranya67veena@gmail.com