can we transport requests from production to development for
client copy using scc8?

Answer Posted / sanjay

Yes We can make a Client Copy by client export method, from
the Souce PRD system to target DEV System.

and also not in case of client export only but in normal
process we can also move transport from PRD System to DEV
System if required.

Is This Answer Correct ?    0 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How will determine whether your sap server is unicode or ascii ?

669


How to identify a particular T_Code has been modified or not? If yes, how to identify who modified particular T_Code in current system?

2028


List the difference between asynchronous and synchronous transport?

598


How to perform a sap-export and import tables in sap from os level?

780


before doing client copy you have to adjust table space at os level.what is the single command for that?(with out going through all the menu of brtools)

1723






What is XI3.0? Explain XI

744


What is process for applying patches?

694


I am attempting to complete a system copy of bw. When I try to go in to rsa1 afterwards I get the error message, "entry in inbound table already exists." What should I do to solve the problem?

764


what are the main issues you faced in the implementation project?

1535


What are steps for DB Refresh?

1413


What is the use of patches in sap system? Could you name few common patch types?

695


When we install sap r/3 enterprise 4.7, there are several error messages in the sapview.log. What does this mean?

715


What is the purpose of tdevc ?

946


A user moved the transport request from dev to qua. How would you trace him?

745


Explain what is the purpose of tdevc ?

720