P is heavier than Q but lighter than R. Q is heavier than T.
S is heavier than P but lighter than V. Who among them is
the lightest?

(a) V

(b) S

(c) T

(d) R

(e) None of these

Answer Posted / ranjana

a ) v

Is This Answer Correct ?    1 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Bactria double every 3 mins. It is N in 1 hour, when was it N/4?

757


Find the next number in the series 1, 3 ,7 ,13 ,21 ,31?

692


A person starts walking at a speed of 5km/hr through half the distance, rest of the distance he covers with a speed 4km/hr. Total time of travel is 9 hours. What is the maximum distance he can cover?

1101


A student gets 70% in one subject, 80% in the other. To get an overall of 75% how much should get in third subject.

727


If each of the numbers A, B and C are divisible by 2, then A*B*C must be divisible by

718






Ram starts from A walking 2 km North and turns right and walks 4 km and turns right again and walks 4 km and turns right again and walks 4 km and meets Radha at Bwalking in the opposite direction to Ram . Distance between A and B

937


Find the value of (1.99)2

897


A work is done by two people in 24 minutes. One of them alone can do it in 40 minutes. How much time will the other person will take to complete it

720


In a club there are certain no. of males and females. If 15 females are absent then no. of males will be twice that of females. If 45 males are absent then female strength will be 5 times that of males. Find no. of males actually present.

621


A certain street has 500 buildings. A sign-maker is contracted to number the houses from 1 to 500. How many zeroes will he need?

1302


If LOAD = MPBE and DRIVE = ESJWF Then LADDLER = ?

896


The sum of the digits of a two digit number is 8. When 18 is added to the number, the digits are reversed. the number?

674


A power unit is there by the bank of the river of 750 meters width. A cable is made from power unit to power a plant opposite to that of the river and 1500mts away from the power unit. The cost of the cable below water is Rs. 15/- per meter and cost of cable on the bank is Rs.12/- per meter. Find the total of laying the cable.

782


A building with hight D ft shadow upto G A neighbour building with what height shadow C ft is?

720


A shopkeeper bought a watch for Rs.400 and sold it for Rs.500.What is his profit percentage?

1041