how many no of cement bags required for 1:4 plastering for
100 sqft?
how many no of cement bags required for 1:3 plastering for
ceiling for 100 sqft?
Answer Posted / lawrence.m
We assume the thickness is approx. 0.5inch. So that the volume is 100sqftx0.5=50cft(1.416cum).
For 1 cum( CM1:4), 1/5x 1440= 288Kg cement required.
Therefore, 1.416cum = 407 Kg required(Approx 8 bags)
For CM 1:3, = 510 Kg (Approx. 10 bags)
| Is This Answer Correct ? | 10 Yes | 58 No |
Post New Answer View All Answers
how to calculate rate analysys of 1:6 plastering 10 sq m
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
what does the grad of cement shows (denotes)?
What is Refuse Area In High Rise Building ?
what"s the sort of beams?
what is column foundation
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
How do we calculate the power of centrifugal pump?
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
how can we calculate steel value, depending on load