Dear Sir/Madam,
I am attending an interview for ETs in BHEL. I have cleared
my written test under Electronics (Instrumentation). This
is the first time I am appearing for an interview. Can any
one who has attended the interview earlier give me a clue
to face the interview.
With regards
Sindhu
Answer Posted / matrix controls c.subramaniam
Sindhu,
For everyone everything is first time first only,
No body has experienced anything before or while birth so
be bold and confident be through in your basics dont trell
wrong answer if you dont know say dont know, try to be
smart as this age people.all the best and god bless you,.
| Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
If a control valve is hunting means means if we are giving 50% to the cv, the cv will open at 51% then slowly slwoly it will reaches 49% , so what to do for solve this problem. The cv is double acting and mounted for anti surge operation, it having 4 nos. volume booster, one sov, one positioner, etc..?
What is the difference between working pressure and calibration pressure of a control valve
Q- What are the application in which PNP transistor is preferred over NPN ?
what is the difference between active & reactive power?
can u briefly explain aboutan aryton shunt multirange DC ammeter?
what is a good line as ic engineer as maintenance ,oc, project, calibration ,validation engineer?
Somebody can explain me about >Critical Loops, calibrations, ESD critical Loop checks, Logic Diagram / Cause & Effect checks for ESD loops,
What are de-saturators?
how u calibrate sox nox co2 co in cemps?what is opacity n HPm?tell the standard parameters of cems?
our kks tagging is crossing more than 12 character please suggest how to take tags in the DCS
Draw bode plot of any transfer function. Why is plotting bode necessary?
How the warning lamp of a charging-system is activated ?
what is the advantage of submersible level transmitter compare to ultrasonic level transmitter?
why we use cascade control and feed forward control in 3 element drum level control measurement of steam drum .what is cascade and feed forward control system ?give example .
what is IEC code in cables & how to selecting cables?