Advantage of central instance on application server
Answer Posted / shyam
central instance has message server installed in it and
application server takes request from the message server
requested by user. message server check wich application
servers are free and will assign the job to the free AS.
AS is part of Central instance. Plz correct me if am wrong.
| Is This Answer Correct ? | 3 Yes | 5 No |
Post New Answer View All Answers
How to identify a particular T_Code has been modified or not? If yes, how to identify who modified particular T_Code in current system?
What is process for applying patches?
What is difference between oracle 9i and oracle 10g?
What are the DVD's Download for implementation?
Explain logon groups?
What are the different modules of SAP?
before doing client copy you have to adjust table space at os level.what is the single command for that?(with out going through all the menu of brtools)
What is redolog file? Path?
what are the pre-requisites to apply support patch?
What is ocm and how to apply ocm patches?
What is the use of profile paramater ztta/roll_area?
How to add authorizations, how you will maintain profiles?
I also wanna work with Webdynpros? What are the requirements? I mean SAP 4.7 ee or ECC 5 or 6? Netweaver developer Studio? Also with win 2003 i have the activation problem every month. SO do i get a cd that doesnt ask for the activation? i have win 2000 but can it be installed on HP pavilion laptops that are coming preinstalled with Vista OS?
What are the errors you got while applying support pack?
i am arun, as of now i am working in a power plant. I did B.E mech and have completed PGDC in thermal power plant engineering from NPTI(NATIONAL POWER TRAINING INSTITUTE). I started my career in software oly , as i dono any software languages i got failed in conformation exam. Pls help me , i want to enter software field. in this powerplant field 6 working days for week and holiday is also not sunday, i am not able 2 tc of my family... pls help me how to enter sf fielf. my frds sujjested me 2 try as functional after 2 years. wats the procedure for that... pls pls help me in this issue I have 1 year exp in power plant, i knew mechanical design software. my id : arun0029@gmail.com