Answer Posted / benarji
generally now at Commercial building using
every were r using 50*dia of the bar
some times compression side 45 *dai ofthe bar are used
| Is This Answer Correct ? | 13 Yes | 12 No |
Post New Answer View All Answers
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
Minimum and maximum size of the building components
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
What are the different methods for drawing an arc?
questions with answers to face an interview of an civil engineer regarding RCC buidings
What is Critical path in Ms-Project ?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
what discoveries did you have in relation to your course?
What is meaning of tlc
What year was the keystone power plant in Indiana County constructed?
Define current ucs?
what is the formula to find the diagonal shape stirrups?
How do we calculate absolute pressure?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?