what is softstarter? explain briefly where it is used?
Answer Posted / madhu
The purpose of soft starter is to limit the starting
current during HT motors startup, as well as it limits the
voltage drop at motor terminals side.
We have different types of soft starters like FCMA, Auto
Transformer, LCI etc.....
Those soft starters will be in line at the time starting
only i.e. approx. 50-60sec. After that bypass breaker will
come in to the line.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
what is the minimum (Common factor) insulatin resistance of the following a, 4mm sq wire b, cable from 50 mm sq to 800mm sq
what is the illumination level required for child play area?
Please clarify 1. Icw: rated short circuit working withstand capacity 2. Icu: Rated ultimate breaking capacity 3. Ics: Rated service short circut withstand capacity 4. other specification of ACB
how to calculate voltage drop and followed by cable calculation?is there avail in formula?
I meggared my 2c*70 sq mm AL AR XLPE cable. its one end show 50 M ohm . is my cable is safe for laying. I have only one phase and neutral.
Dear All, I am new in construction company , my boss ask a question at time of interview , If we have 60MW generation and Single Power Transformer step-up we have. if CMR 50/60MVA , ONAN, ONAF respectively , is it sufficient or not ? for that much power to transfer,
why the name trunking bus PT
HOW can i REuse the fused MLL LAMPS & GLS LAMPS at our factory
why co incidence factor considered in transformer sizing?
What is self exciting?
Why PT voltages are measured with respect to ground? What do u mean by voltage or current polarized.
What is K-rated transformer? What is the use of it? What can be the size(pls provide calculation if possible) of K- factor transformer for 550kW,690V motor operating with drive (VFD)?
What is the physical significance of phase.. i.e. what is exactly the meaning in layman's language.. 1 phase, 3 phase etc ???
when elecromagnatic waves are propogated in a wave guide?
Is it required to lay GI wires along with GI/MS conduits from one point to another point though separate earthing cable is conncted from DB to Socket?