how much quantity of cement(bags)concrete(20mm)and
sand(sqft)is used in 1:3:6 PCC
Answer Posted / ds raju
Ccement
cement 3.7 bags, sand 0.48cum and CA
0.96cum
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Which are the top apps for you civil engineer?
Mention different types of roof systems?
what could be the production cost of 1 cum of concrete by CP30 plant
please send me bhel questions on rupesh.017@rediffmail.com
What is the tallest man made structure in the world?
Is there the dry coefficient of cement is constant?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Is there any course for billing available in Mumbai? If yes then please mail me the details..
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
TELL ME THE EQUATION FOR OGEE SPILLWAY
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
how to calculate MR 9(derivation)
what is the effect of duration of earth quake on framed structures ?