Answer Posted / dushyant bansal
A splice plate is the plate that is attached to two
different sections of steel by using revate or bole in
order to make the two sections 1 single unit.
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
how to conversation of all construction material in to brass
How to check slab shuttering level.? Or check list for slab ?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
In cement making,what is meaning of blend,fineness,density.
what is a well
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
construction workers how much time take one work or qty
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
How is calculate the cube molt
Define current ucs?