Answer Posted / dushyant bansal
Generally In a prestressed COncrete Girder Stresing is done
using multi pull jacks that can pull all the cables in a
seething pipe. Also jacks are provided on both the ends of
cables and stress is applied to it until it reaches the
specified limit.
Elongation of the cables is also measured to cross check
the tension in the cables.
| Is This Answer Correct ? | 58 Yes | 7 No |
Post New Answer View All Answers
What tor stands for in tor steel?
Explain major difference between auto level and dumpy level?
what is the water cement ratio for plastering
What is braced excavation all about?
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
what is the service corridor?
Explain what is progress payment?
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
how to find hardness of water?why it should be determined?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
Define What are the uses of Groynes?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2