Answer Posted / dushyant bansal
A Green Building is a preety vast term.
But any building certified under LEED or IGBC is considered
as Green building
These certificates can only be obtained if the building
uses most Renewable Natural resources than Non-Renewable
resources.Also wastages of Electricity & Water is minimum
and ample Green space is provided in the surrounding of the
building.
Is This Answer Correct ? | 13 Yes | 0 No |
Post New Answer View All Answers
I want to join bhel because
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
how to calculate total cost for slab 35'×8'
which method is used in semi-rigid connection design??
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
how do we design mix ratio?
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
(Project Management Topic) What are the important criteria in the successful realization of the project?
For fine aggregate which is most suitable River sand or crusher sand & why ?
What is difference between combin footing & rapt footing
what is right & short method of measurement of slab&beam
what is thumb rule for calculating the size of ISMB required for a particular length of span
What is an object snap mode?
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?