how to calculate steel columns beams and slab please give
me brief calculation
Answer Posted / maharajan
1.RCC Footings of columns -
0.50%
2.RCC Beams -
1.0%
3. RCC Columns -
1.50%
4.RCC Chujja and sunshade -
0.50%
5.RCC roof slab - 0.80%
Is This Answer Correct ? | 80 Yes | 19 No |
Post New Answer View All Answers
The foundations are placed below ground level, to increase?
Please tell me vasthu room sizes. Thanks.
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
why we use 19x9x9and 20x10x10 but not other
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
Define mirror?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
What materials were used to build the golden gate bridge?
pls tell me , what is the water content
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
In cement concrete how to check a quality of material also proportion of material at site ?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
Describe the various methods of concrete curing?