Cost control in civil construction as well as Quality control
Answer Posted / dushyant bansal
If one can provide a control on Quality, Cost and Time all
at a time then the cost can be perfectly optimised.
For the above said minimum wastage and timely completion of
work must be assured.
This can help in cost control as it can help us reduce
inventory cost.
Also labour time wastage can be reduced if all work is done
with a planned schedule. whichin turn affects the cost.
Lean production is the best method i consider to optimise
the cost.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How do you maintain water pressure?
How do we determine the specific gravity of a cement?
What is Critical path in Ms-Project ?
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
how to preaper for interview wat they asked in interview give me idea
Why should appointment store person for project ? what is the benefits for company ?
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
What is passive earth pressure ?
WHAT IS YOUR EXPECTED SALARY?
what is the price of a cubic meter of concrete on international market?
what is the use of water bar in water tank and is this an extra item in estimate?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
TELL ME THE EQUATION FOR OGEE SPILLWAY