How much time it will take to develop a report in real time?
It depends upon the complexity of the report, so tell me
the approximate time period for a simple list, cascading,
master-detail, drill-through,..…etc?
Answer Posted / piggynet
Beckham if u just want to develop the report from the
prepared metadata you don't need to prepare any documents
you just wwork on report studio drag and drop or double
clik the query items it will be in work area for the list
report and it takes only few seconds if everything is
prepared and ready for the report.kranthi is right about
the timings.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Define datastores in cognos?
What is the difference between the standard and metrics folder?
How to create model and how to test model?
how can we Upgrad the reports from version Impromptu 6.0 to 7.0 and Power Play from version 6.6 to 7.0 ?
----------------Diff b/w Dimensional modeling and Relational modeling?
what is the difference between querystudio in reportnet and cognos8
What are products of cognos?
I have a reports on cognos ep7series version3 with database SQl2000.Now i am migrating database SQL2000 to SQL2005.Then What happens to cognos reports and also there is reports cubes then how can i handle this problem please give me step by step solution b'coz i am new to cognos ep7series
what are the filters in framework manager and report studio?
how the values be passed to prompts in report studio? when a data item is dragged n dropped in to report, after the default query generated first which sql will the query query hit for processing means (native or cognos)? plz answers to these questions?
What do you mean by query studio?
What is the information present in the cognos configuration file?
how to merge 2 crosstabs thans
What is the function of cognos dispatcher?
what are the features in cognos8ui