you found a bug and send it to the developer for
rectification but the developer not accepting that bug at
that time what will u do?(plz its very urgent give me the
best answer plz)
Answer Posted / vandana
If Testers are raising a bug which developers are not
accepting then in that case, testers need to follow
following steps
1. Tester need to make sure that the environment in which
devlopers are testing and the environment in which testers
are testing are same
2. Have a telephonic talk with developer giving them exact
steps through which it was possible for QA to encounter the bug
3. Share the detailed snapshots having details like TEst in
build, Tested in, Tested on details
4. Share the application with developers using vnc and try
to recreate the same in their presence
5. Lastly, if developers still not accept the bug, approve
your higher authorities (TL/PM/OSC) detailing them the
scenario and follow their advice
Thanks.
Vandana
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is internationalization testing (i18n testing)?
list of methods that is used to document the requirements of a software.
How will you prepare traceability matrix if there is no Business Doc and Functional Doc?
What is configuration management in software testing ?
hi every one can you send me ISTQB Course material on my Email id deeptimundra997@gmail.com
What is difference in between operating system 2000 and os xp?
When we are recording in WinRunner and interact with the AUT, what does WinRunner do?
what will be verification and validation test cases for yahoo login page (only functional test cases)? Please explain in details.
What knowledge I must have as a 3 yrs. manual tester??
What are the uses of test plans? What is the need of test plans and explain their significance
Why testers wil prepare useracceptance testcases,system testcases and integration testcases,What is the differenece between all this test cases
There is only requirements document. You have 10 days and 8 resources to release the system.At the end of the 8th day u tell ur TL that system is ready for release. How will you proceed with the testing process or in other words what all approach you will follow once you get requirements
What type of questions will be asking for 2 years experience candidate in manual testing?
what are the 3 test tool categories and describe what each can do.
What do you like about computers?