how to calculate the required qantities of cement, Sand and
aggrigate to prepare 1 Cum of concrete mix 1:2:4
Answer Posted / pritesh .c . bhoi
mix desighn = 1:2:4= 7
quantity is 1 cum add 52% westage and shreankage
so 152 cum
cement = 1*1.52/(7)=0.21714 cum (dry volume)
volume of one bag is 0.0347 cum
so no of bags are 0.21714/0.0347= 6.25 nos say7 numbers
bags are required
sand = 2*1.52/(7)=0.43428 cum
course aggregates = 4*1.52/(7)=0.86857 cum so conclution
is
cement =7 nos bags
sand =0.43428 cum
course aggregates =0.86857 cum
if any mistake please informed . thank you
| Is This Answer Correct ? | 24 Yes | 9 No |
Post New Answer View All Answers
What is the different type of slump test indications?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
TELL ME THE EQUATION FOR OGEE SPILLWAY
what is the minimum cement content for M20 & M25 as per is code -456(2000).
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
what are the types of design? which type of method is used at what type of design & why?
What is the significance of cost estimate knowledge for an architect?
Explain creep?
How to check slab shuttering level.? Or check list for slab ?
what is difference between GTS bench mark and temporary bench mark
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
What goals do you have in your career?