3, 5, 8, 13, 24, 39, 72
FIND THE WRONG NUMBER
Answer Posted / anirban bose
24 is the wrong answer.
5=3*2-1
8=5*2-2
13=8*2-3
22=13*2-4
39=22*2-5
72=39*2-6
So it should be 22 in place of 24.
Is This Answer Correct ? | 15 Yes | 5 No |
Post New Answer View All Answers
How is the father of the man ,who is the brother of the only aunt of my brother related to me?
a train runs first half of the distance at 40 km/hr and the remaining half at 60 km/hr. What is the average speed for the entire journey?
If A, B and C are the mechanisms used separately to reduce the wastage of fuel by 30%, 20% and 10%. What will be the fuel economy if they were used combined.
If INDIA = JOEJB then BSNZ =?
If A/B = 3/5,then 15A = ?
Two sentences are given and we were required to print the common word in the two sentences. Words were delimited by space, full stop, ? , ! and , . The trick in the question was that common word should be printed only once so if ur first sentence contains two word "how" and second contains "how" then in output how should be printed only once for this u can replace each matched word in second sentence by spaces . i want a solution in C/C++ language
A chain is broken into three pieces of equal lengths containing 3 links each. It is taken to a backsmith to join into a single continuous one . How many links are to to be opened to make it ?
WHO WAS GIVEN BEST ACTOR AWAR 2010 IN FILM FARE?
4 couples have a party.Depending on the set of statements,find who insulted whom and who is the host of the party.
Sister's age is twice than that of the brother. If the brother's age is six, what is the sister's age after two years?
A mall installed 36 cctvs at the beginning of the year. In March they installed 9 additional cctvs and then disconnected 18 in August. How many were still installed at the end of the year.
If a and b are positive integers and (a-b)/3.5 = 4/7, then the relation between a and b is
A contractor employed 200 men to complete a strip of highway in 200 days. After 150 days he found that only 3/5th of the strip is complete. How many additional men should be employed to complete the work on time?
Differences you see in private and public bank?
What Is Kyc?