Answer Posted / raks
because block is a made part of cement only,wher brick is
from clay hence for concrete block cement co-efficient less
than bricks.......
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
what is meant by csr in foundation? what is sbc?what is meant by contour line?
What is the basic difference between OPC
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
WHAT IS YOUR EXPECTED SALARY?
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
How we calculate the service time of buildings
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
How much percentage of brick bats allowed in CD-75 bricks
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
rimmer in pile foundation