Answer Posted / ganguly
there are two types of speed control for dc motor
1. armature control method
by connecting the additional resistance to the armature,
but this will use below rated seeds only
2.field controlmethod
by connecting the resistance to the field
but this will use above rated speeds only
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
A TRANSFORMER 440/400V,DELTA/STAR CONNECTED.THE NEUTRAL CONNECTED WITH GROUND CABLE THAT IS DIRECTLY CONNECTED TO THE PANEL,FROM PANEL IT IS CONNECTED EARTH PIT.IS IT RIGHT? IF IT IS RIGHT LEAKAGE CURRENT AFFECTED.SECONDATY IS PROTECTED WITH EARTH LEAKAGE RELAY.
hi I have done 3 yrs diploma in electrical engg after 10+2. I have 16 years of work experience into design proposals sales and engg application development in LV/MV swithcgear and sub station automation field. I want to apply for immigration to new zealand but I am not sure whether I qualify or not since I dont have a degree. Can anyone advice? Thanks Riz
How to decide DO set rating of Transformer?
hi, i finished b.tech eee in 2008, im worked in dg sets mfg company , now i left job in 6months back, now again i want get job core side, how can i get? is there any couses we have learn to get better oppurtunity? /
why Current is lead 90 degree and voltage is lag 90 degree in a capacitor.? why Current is lag 90 degree and voltage is lead 90 degree in an inductor.?
what is charger supervision and control supervision?
Earth leakage relay basic knowledge principle
Which cable is use for rtcc control panel
why not starting switch first connect in direct on line starter?????
What is the formula for calculating no-load current?
1.why should we connect the measuring instruments in l.v side in short circuit test of a transformer? 2.why the power factor is less in open circuit test of a transformer?
An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.
How can we design a HVAC Plant room which includes AHU,FCU,Chillers,Cooling towers, Pumps etc & how will they work? any Drawing if possible?
I need to connect a synchronous generator to the grid using automatic synchronization and two circuit breakers (one for synchronization, one for end connection to the grid), how to determinate the required diameter of the cables?
Whata are the types of Cables?