Answer Posted / rama
order types are divided into subcategories like production
order (normal), process order (for process industries
food ,chemicals), network orders (in ps systems),rework
order etc.
we can collect the costing information for these sub
categories.
Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
what is group bom? Is it possible to attach the drawing for a material to bom? How?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Tell one biggest task for you
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
What is planning file entry
What is the use of data in work centers?
What is phantom item & sub contracting
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is the role of an administrator in pa?
What is 'capacity planning'?
Explain variant configuration
What is standard order type
Special Procurement type 40 – proc. form alt. plant
Both labor and machine categories exist. How would you calculate the process time?
What are the different type of BOM usage?