Answer Posted / r.k.gupta
According 4rh revision MORT'H the F.M. of sand is 2.0--3.5.
from Zone 1 to Zone 4
| Is This Answer Correct ? | 9 Yes | 12 No |
Post New Answer View All Answers
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
why the profile of shell of natural draught cooling tower is hyperabolic.
What is the difference between tor steel and tmt steel?
How does a traffic light signal work ?
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
What is the exception critarea of cube?
What are your goals?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
Why was the empire state building made of steel?
which type of instrument included in plumbing work?name of instrument?
What are the applications of modulus of elasticity?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
What is the difference between 53 grade and 43 grade cement
How to calculate canal slope curvature qty!