Answer Posted / r.k.gupta
According 4rh revision MORT'H the F.M. of sand is 2.0--3.5.
from Zone 1 to Zone 4
| Is This Answer Correct ? | 9 Yes | 12 No |
Post New Answer View All Answers
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what are the layers of the national and heir aprox thickness??
what is civil enginnering & what you need of this course?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
what is c4x light weight cement blocks
Explain what is Hybrid Foundation?
acceptance criteria for concrete works
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
Define What does civil status mean?
What is geopolymer based concrete?
why we use 19x9x9and 20x10x10 but not other
What is the purpose of Chipping in the heavy foundation?
How to testing voids of filled aggregate in bitumen mix design
how do you stabilize a waterlogged area in road construction