How to calculate the no of bags required for 12mm thick 1:6
plastering?

Answer Posted / manish katiyari

finished volume=12mm = 0.012m =1.2m3
prop 1:6=1+6=7
cement req= 1.2/7
=0.17143
1cement bag=34.5 litres
=0.0345m3
cement bag req= 0.17143/0.0345
= 4.97 bags
approx = 5 bags

Is This Answer Correct ?    16 Yes 20 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HOw much % of premium on DSR-2013 currently

2048


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

2240


What is the strength of 1:6:12 mix?

3159


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1618


Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com

2102


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

2060


please send me bhel questions on rupesh.017@rediffmail.com

2797


While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

1671


What is Density of cement, sand & aggregate ?

1612


plz.show development and anchorage length in simple diagram.

2638


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

3237


can i get civil engineering test papers.......?????

2550


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2235


PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg

2423


water leak detection system question & answer

2526