How to calculate the no of bags required for 12mm thick 1:6
plastering?
Answer Posted / dinesh
Cement= 1 Sand = 6, assume W/C=0.4
Water = 0.4*1= 0.4
Total = 1+6+0.4=7.4
Wt per m3 of CM = 2400 kg
for 10 m2 = 1.2 cum CM reqd.
Cement required for 1 m3 = 2400/7.4 = 324.3 kg = 6.48 bags
so for 10m2 area of 12mm thick plaster = 1.2*6.48 = 7.78
Bags required.
| Is This Answer Correct ? | 13 Yes | 27 No |
Post New Answer View All Answers
How do you calculate reinforcement weight of steel?
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
How to calculate 1 brss for RCC work
How to calculate laplength for 3 floors
how many types of survey and what are levelling instrument?
five benefits of using standard terminology in the measurement process
how to calculate the weight of concrete
how to design and calculate materail quantity for concrete speedbreaker ?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Why should appointment store person for project ? what is the benefits for company ?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
Define What is a projection line?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
I am called for interview from north east power plant .so, I need some interview question which may help me.
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?