in our sub station why we step down firstly 33kv\11kv then
11kv to 430v. can we direct step down 33v to 430.v.
Answer Posted / vrs rathore
Yes we can, but if our exixting system is workable for only
11kv and required capacity is more then 4000kva then we
have to take 33kv connection and after that it has to step
down 11kv for supplying our esisting system, which is
working only for 11kv/430v.
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
exolain the star delta connection
what percent do you derate your copper wire when you change from copper buss to copper wire
why magnetising curve not start with zero voltage?
What is the most accurate way of testing ELCB?ELCB is better than RCD?
how can get electrical "c" licence.i am complited in DEEE.PASSING YEAR OF 1993.WORKING IN PVT COCERN LT LINE.PLEASE ADVISE ME .CELL NO 9994786021
WHat is the requirement of installing FAST ACTING EARTH SWITCH in GIS and how is that integrated with protection system. How and when does it operate?
how we provide neutral earth on synchronising panel as per electrical standards?
Is it possible to make a 5P10/ CT Ratio 50/1A Burden 5VA
what is static frequency converter?what is the function...of sfc...?
There are Two questions about Steam Turbine Generator... What is HRSG bypass of LP, HP used for in power generation? In particualar, in the event that fault of HP bypass, there would be STG TRIP in operation but none on the LP bypass fault...what's the reason ?
how we test a 3 phase motor on single phase supply....? HOW WE RUN A 3 PHASE MOTOR ON SNIGLE PHASE. supply for testing..? how we verify of a 3 phase motors 6 wire & name thame a1/a2/a3..b1/b2/b3 and c1/c2/c3 for connecting star delta starter ........i have only 1 phase supply ? help forum..........
Pl. give me checklist for installation & commissioning of machine tool.
3phase cable calculation formula by motor load
Electronic circuit
Comment on the working principle of operation of a single-phase transformer.