if we use fuse in neutral what will happen?

Answer Posted / cyber4india

The neutral should be solid and only Link should be provided
in neutral as if fuse is provided, in case of shock, it will
blow due to overload, but the supply will be available
through phase and the purpose of fuse is defeated.
In some case(domestic wiring) the neutral also contains
some potential due to unbalance of load in the supply (3
Phase). This holds true even if you are using the one out of
three phase . The neutral is displaced due to uneven
loading. Hence for any purpose of working, neutral Links
should also be disconnected along with the fuse in phase supply.

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How one can check the MAIN of a house wiring ?

1457


How will be the single line diagram of series trip HT breaker? how it works?

2092


What is the formula for calculating the Instantaneous Short Circuit & overcurrent for any breaker

1468


power transmission pole used one support , that only for support or earthing

1424


during installation time of transformer and alternator which points we have to observed?

1485






1.WHAT IS A SMART CAPABLE DB ( DISTRIBUTION BOX) ? 2. HOW TO DECIDE THE TYPE OF DB TO BE USED ( RECESSED/ PLUG TYPE/ SMART ETC ETC? 3. WHAT IS MILLENEUM BUS BAR USED IN DB? 4.DIFFERENTIATE MCCB AND MCB.

1401


how we can do the insulation on secondary of ct explain and so that tan delta will within limit

1452


What shall be the secondary output voltage if the primary winding of a 220/6V, 50 Hz transformer is energized by an 110V, 60 Hz supply?

870


What is capacitance?

734


What OPGW is better than Microwave or PLCC???

3649


what is the differencce inn series and cascade connection??

4237


What is nichols chart?

770


Can XLPE/SWB/PVC (P3) 7C X 2.5mm2 be replaced by Can XLPE/SWB/PVC (P2) 7C X 2.5mm2??? P3 vs P2

1358


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1564


what is feeder bay?

1112