Answer Posted / akhilesh
Please use DC Drive
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to calculate size of HT breaker with the help of Amp (current)? Please provide answers with examples.
Hi,I am working in abroad for more than 3 years in a company operating with 11kv and 6.4 MW power. I need c licence in India,can I? some other says only i can get if i work for 2 years in india only! anybody kindly clarify by doubt.Thanks
If we need4× 50mm sq cable but it's not available so we can pull 4×25mm sq 2cables
what is the minimum pay scale for electrical engineer (building construction)in kuwait? plz revert back with yrs of experience & pay scale respectively.
What happens when two positively charged material is placed together?
In a synchronous motor. if start is running at high speed. What will be the starting torque : Higher Lower Zero
What OPGW is better than Microwave or PLCC???
In Air circuit breaker LSIG protection unit is used. Without fault in cables (2 runs 3Cx150Sq.mm Copper, 1Kv grade, XPLE armored cable IR value is more than 550Mohm @ 500V Megger) and load section Long time Overcurrent protection is triggers and trips the unit. We changed LSIG protection with new factory tested unit. Even then fault is persisting. Please suggest the possible causes
A 400KVA transformer has 400 Hz frequency. If the frequency is changed to 50 Hz, then what will be the new KVA rating?
Explain Creepage Distance of Insulator
how give earthing conection to household equipment?
how to discharge 3 phase power factor correction capacitors
When we giving the 3 phase supply to ups system how to coming netural?
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
What is the disadventage of gland earthing(power cable) if any. ?