Answer Posted / anoop didwnaiya
h/3 above floor & h/3 below slab.
ex- if h=4mtr. then 1.33 above floor & 1.33 below slab.
| Is This Answer Correct ? | 37 Yes | 4 No |
Post New Answer View All Answers
How do you calculate reinforcement weight of steel?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
why do we provide haunches in rcc box or underpasses?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
material used for mendrel use to bend epoxy coated rebar
why top layer of block work shoud be full size if any cut block adjustable than another layer?
For the construction project what capital cost has to be taken in consideration?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
what is thumb rule for calculating the size of ISMB required for a particular length of span
Which are the top apps for you civil engineer?
how meny typs of renging rod?
What are your goals?