Answer Posted / anoop didwnaiya
h/3 above floor & h/3 below slab.
ex- if h=4mtr. then 1.33 above floor & 1.33 below slab.
Is This Answer Correct ? | 37 Yes | 4 No |
Post New Answer View All Answers
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
How is the leaning tower of pisa supported?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
it is possiblee to produce concrete with out cracks...
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
What does civil status mean?
All aptitude question of Bechtel
Why are separation membranes used between concrete pavement slab and sub-base?
i need gate exam civil engineering question papers with answers