One wordswill begiven find oddman out:
a) sow b) cut c) sickel

Answer Posted / neha

cut

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

During a given week an author spends 1/4 of his time preparing first drafts, 3/8 of his time editing the drafts and the rest of the time in preparing final drafts. If he works 48 hours during the week, how many hours did he spend in preparing final drafts?

782


X < 0, Y <> 0 then what is the possibility that the result is always positive?

938


One dollar is saved in one month. Then how much dollar is saved in one day?

710


A man is running around a rectangle it takes time 2 time in travelling length than travelling width total perimeter = 300. Find area.

801


After spending 2/3 of his salary on rent and food items and 1/4th of the remaining on transportation, Rajesh has 6000 with him. How much did he pay on transportation?

1752






In how many rows will 200 Miranda bottles be placed, if 200 Miranda bottles are stacked in such a way that there are 20 bottles in the bottom, 19 in the next row, 18 in the row next and so on?

798


the probability of getting at least in a single through of three coins is

681


if 2 miles of fence enclose a square plot of 160 acres,how large a square will 4 miles of fence

5931


How can 1000000000 be written as a product of two factors neither of them containing zeros

823


Complete the sequence A, E ,I ,M ,Q ,U , _ , _?

683


What is degree of a Relation?

714


If substitution is as it's burnout. Didn't remember. But this is one.

4216


I am writing the APSRTC OUT post.so i dont know the managerial aptitude.If any one know about this or refer any book, please give the information to my Mail id is narayanansg@gmail.com

2191


Find the speed of the boat in still water if the river runs at 4 km/hr. The time taken by a Suresh to row the boat upstream is 3 as the time taken by him to row it downstream.

911


A finish the work in 10 days. B is 60% efficient than A. So hoW days does B take to finish the work?

643