Procedure for conduting vector group test on power
transformers.why it is conducted?
Answer Posted / anil k panjani
I would like to know the test procedure for Dyn11 vector
group and the conditions to be met for the same
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Dear All we are having a problem in G120 BOP showing alarm A0503, F0052, F0060 we can not remove fault alarm ,Please any body help us. kowsar
At full load wat is the motor p.f And at no load will is the motor p.f?
Draw the wave shape of armature current in a generator subjected to a sudden three phase short- circuit at its terminals. Define various reactance of generator from this wave shape.
What is self exciting?
Yazaki india pvt ltd interview questions qurey related
how to compute kvar in substation feeder to improve power factor and sending voltage
What is difference between start imitation and start interlock for 3 phase motor protection ?
in Contactor opearation Why there is a difference in the values of the operate and release voltage in case AC supply
What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.
What is an ac motor?
1.why should we connect the measuring instruments in l.v side in short circuit test of a transformer? 2.why the power factor is less in open circuit test of a transformer?
WHat is the general checks required for Dry type transformers
What the formula for calculating no.of earthings & size of earth strip for 100mX90m shop.
What does the term “voltage regulation” means?
what is the need to express current and voltage in rms value? rms value is also called as effective value,what is effective value?