how is the wastage component in structural steel being
considered while doing the reconcillation for the
fabrication with returning of scrap under 1 meter length
Answer Posted / sandip panda
wastage is considered as 5% in a metric ton.
| Is This Answer Correct ? | 13 Yes | 8 No |
Post New Answer View All Answers
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
How can we convert weight batch to volume batch for m30 mix
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
How to calculate the load of partion in flat slab if we use brick?
How do we calculate the power of centrifugal pump?
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
Explain what is 1/8 on the architect ruler denotes?
How to calculate brick work quantity?? Block work quantity??
what is diffrence between catchment area,watershed and basin?
How to testing voids of filled aggregate in bitumen mix design
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
What are some structures that may be subjected to fatigue?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.